2010
Spain
Institutional
Back in 2010, we entered our city’s airport to make our mark there. We have done cladding work on the walls and ceilings of the new control and monitoring rooms. Smooth plywood panels on the walls, including the cladding on the curved walls.
The cladding on the ceilings, we have also manufactured and installed, perforated veneered panels. We mounted them with a concealed grid system, so that the wood paneling would show off. The ventilation slots were also part of our production.
In the VIP room we developed, manufactured and installed all the fixed furniture. Made of oak veneered board, simulating solid wood to match the black leather sofa and perforated ceiling panels. We have manufactured low tables, desks and sideboards.
We have also made the partitions of the bathroom made of melamine, machined and manufactured in our workshop. The access doors to the sinks were fire resistant, also manufactured and installed by frapont.